How to Build a Garden Suite in Toronto, Scarborough & Etobicoke — A Homeowner’s Guide

What Exactly Is a Garden Suite?

A garden suite is like a mini home tucked into your backyard. It has everything needed for comfortable living—bedroom, bathroom, kitchen, and a cozy place to hang out. Many homeowners use them as guest houses or rent them out for extra income. With the right design, even a small space can be both stylish and practical.

Step One: Check What’s Allowed on Your Property

Before jumping into floor plans, it’s essential to make sure your property qualifies. In Toronto (which includes Scarborough and Etobicoke), many residential lots can host a garden suite, but there are specific rules around setbacks, size, and parking. The City of Toronto website has zoning maps to guide you. Once you’re sure it’s a go, the real planning begins.

Designing a Garden Suite That Works for You

Now the fun part—design. Work with a local architect to shape a plan that makes the most of your backyard. Look for modern designs tailored for small spaces—these offer both function and style. Natural light, privacy from the main house, and smart layouts go a long way. This part usually takes 4–8 weeks, depending on how detailed your vision is.

Utility Connections: The Less Glamorous But Essential Bit

Utility Connections: The Less Glamorous But Essential Bit

Your garden suite needs access to water, electricity, and possibly gas. Usually, everything connects back to your main home.

– Water: A ¾-inch line usually does the trick.

– Electricity: You may need a subpanel if your current one can’t handle the load.

– Gas: Used for heating or cooking—it requires a pro to assess and install safely.

Expect utility hookups to cost somewhere between $5,000 and $15,000.

Construction Choices: Should You Go Modular or Traditional?

Modular builds are gaining popularity—and for good reason.

– They’re built off-site, then delivered and assembled on your property.

– You’ll save time, reduce on-site mess, and often spend less overall.

– Expect to pay between $150,000 and $250,000 depending on the layout and finishes.

Traditional construction offers more design freedom but often comes with a longer timeline and bigger price tag—anywhere from $200,000 to $300,000.

How Long Will It All Take?

Here’s a general idea:

• Zoning & Permits: 1–2 months

• Design: 1–2 months

• Construction Permits: 1–2 months

• Build Time: Modular (3–4 months), Traditional (7–9 months)

In total, expect about 6–8 months for modular and up to 15 months for traditional builds.

Keeping Mold and Moisture Away

Keeping Mold and Moisture Away

Modular builds are created in controlled environments, which means they’re usually well protected from mold from the start. Still, you’ll want to ensure your foundation is well-drained and sealed. It’s worth hiring a contractor who knows how to prep a site properly.

What Might Go Wrong (and How to Stay Ahead of It)

No project is without hiccups. Here are a few to plan for:

– Permit delays

– Unpredictable soil or utility issues

– Price increases due to material shortages

– Bad weather (for traditional builds)

– Meeting building codes

Choose eco-friendly materials where you can—they last longer and can help with grant eligibility.

Jane’s Experience: A Backyard Success in Scarborough

Jane, a homeowner in Scarborough, added a prefab garden suite to her backyard in under 7 months. She opted for a modern design, had a new water line installed, and tied her electrical to the main panel. Now she rents the suite to a university student and puts the income toward her mortgage.

Want to Keep Costs Down? Here’s How.

– Choose a simple layout

– Go modular

– Use durable, eco-friendly materials

– Avoid over-customizing finishes

– Look for rebates or grants to help with energy upgrades

How to Pay for Your Garden Suite

Financing is one of the biggest questions. Luckily, there are several options:

– CMHC offers loans specifically for secondary units

– Homeowners can use a HELOC

– Grants may be available for green upgrades

Why Build a Garden Suite at All?

– You’ll increase your home’s value

– Create a place for guests or extended family

– Earn rental income

– Future-proof your property for aging in place or family changes

Rough Cost Breakdown

Item | Estimated Cost (CAD)

—–|———————

Zoning & Permits | $5,000 – $10,000

Design & Drawings | $7,000 – $15,000

Utility Hookups | $5,000 – $15,000

Modular Build | $150,000 – $250,000

Traditional Build | $200,000 – $300,000

Ongoing Maintenance Tips

– Inspect plumbing and wiring annually

– Clean gutters and check the roof after storms

– Keep moisture-prone areas dry and ventilated

– Check your drainage systems after major rainfall

Need-to-Know FAQs

Q: Where do I start?

A: Always with zoning and permits.

Q: How much will it cost?

A: Between $150K and $300K.

Q: Which is faster—modular or traditional?

A: Modular saves you months.

Q: Can utilities tie into my existing house?

A: Yes, in most cases.

Q: Are there financing programs?

A: Yes—CMHC loans, HELOCs, and some green rebates.

Ready to Get Started?

Adding a garden suite isn’t just smart—it’s personal. It gives you options: for income, family, or future flexibility. Our team at Renotec helps homeowners across Toronto, Scarborough, and Etobicoke design and build garden suites that work with their budget, space, and goals. Looking for the best garden suite contractors near me? We’d love to hear from you. Let’s

Renotec © 2025

(416) 838-3631